Friday, November 24, 2006

New Proposed Hera structure

This is the latest proposed structure for the Hera scheme We need to respond to management with our views as to whether this meets our needs. It is indeed an improvement on the previous structure but that's not to say it is perfect.

Current UEL Structure

Spine Point

From 1 August 2006

Proposed UEL Model

Grade Boundaries

58

£60,408.00

57

£58,648.00

56

£56,940.00

55

£55,282.00

54

£53,672.00

53

£52,108.00

PO (F)

52

£50,590.00

51

£49,116.00

Band I

PO(E)

50

£47,685.00

675

49

£46,295.00

Band H

48

£44,947.00

PL

PO(D)

47

£43,638.00

46

£42,367.00

45

£41,133.00

44

£39,935.00

600

PO(C)

43

£38,772.00

Band G

42

£37,642.00

SL

41

£36,546.00

40

£35,481.00

PO(B)

39

£34,448.00

38

£33,465.00

525

37

£32,471.00

36

£31,525.00

PO(A)

35

£30,606.00

Band F

34

£29,716.00

L

33

£28,849.00

450

32

£28,010.00

31

£27,193.00

Band E

Grade 4

30

£26,402.00

29

£25,633.00

28

£24,886.00

27

£24,161.00

350

26

£23,457.00

Band D

25

£22,774.00

24

£22,111.00

23

£21,467.00

Grade 3

22

£20,842.00

250

21

£20,234.00

Band C

20

£19,666.00

19

£19,073.00

18

£18,517.00

17

£17,978.00

225

16

£17,461.00

Band B

15

£16,967.00

14

£16,488.00

Grade 2

13

£16,023.00

12

£15,571.00

200

11

£15,133.00

Band A

10

£14,707.00

9

£14,293.00

8

£13,902.00

No comments: